RAF High Wycombe, Strike Command
The Challenge
RAF High Wycombe required temporary single living accommodation for officers.
The Thurston Solution
Thurston designed, constructed and installed this £1.4 million, two-storey, 40-bedroom facility at RAF Wycombe. The internal décor, fixtures and fittings were of a high specification suitable for the rank of the personnel who would be living there