We will meet your exact specifications and can even match the appearance of existing buildings if required.
This leading building contractor needed to maximise its on-site space while at the same time providing extensive accommodation.
RAF High Wycombe required temporary single living accommodation for officers.
While working on-site at Lancaster University, VINCI Construction UK needed to demonstrate its shared commitment to reducing both its own and the university’s carbon footprint.
Thurston designed, manufactured and installed a 12 bay SureSpan children’s centre at Tang Hall Primary School in York.
Thurston designed, constructed and delivered a SureSpan Nursery at Dunn Street Primary School in South Tyneside.
At the Waterside Health and Wellbeing Centre for Blackburn Primary Care Trust we installed a 10 bay building which provides two storey's of consultation and treatment rooms, complete with staff accommodation facilities.
Thurston providing three specialist ward facilities including, Diabetes, Gastro and Maternity.
After winning a larger contract, Doosan Babcock wanted to replace a small, hired on-site building with a larger, more permanent version.
Temporary cells were required while Huddersfield Magistrates’ Court was being refurbished.
A five-bay station building with bespoke external and internal finishes was required for Cheshunt Station.
Thurston provided Newquay Airport with a four storey VCR building.
Thurston provided a full turnkey project including the design, manufacture, external works and installation of a 4 team changing facility with office, first aid room and changing facilities.
A community sports changing facility was required to help revitalise sporting activities in the region.